Industries We Serve

Aviation

Airports never really shut down, and the ground beneath a runway leaves no room for error. Kolb brings the earthwork, paving, and site expertise aviation projects demand, building runways, taxiways, and aprons to exacting FAA tolerances while keeping active airfields safe and moving.

Overview

Deep experience building for aviation

From airfield earthwork and drainage to runway, taxiway, and apron subbase and paving, Kolb self-performs the sitework that keeps aircraft moving. We build to tight FAA-spec grades and smoothness tolerances, phase our work around live operations, and hold the line on airside safety and security from mobilization to final grade.

Explore all industries →

Proven at scale

Airfield numbers that speak for themselves

7,500,000 cy

Unclassified excavation self-performed at Lambert International Airport

14,000,000 lf

Wick drain installed to stabilize the ground at Louis Armstrong International

86

Aircraft-loaded, design-build cast-in-place structures delivered airside

What we build

Where we work in aviation

From runways to landside site work, Kolb self-performs the airfield sitework that aviation infrastructure depends on.

Self-performed scopes

What Kolb brings to aviation

Earthwork

Mass grading, excavation, and cut-and-fill to bring airfields to precise subgrade at scale.

Explore earthwork →

Asphalt & Paving

Runway, taxiway, and apron paving built to FAA grade and smoothness tolerances.

Explore asphalt & paving →

Site Development

Complete sitework and project management for airfield and terminal projects, from bid to final grade.

Explore site development →

Underground Utilities

Storm drainage, detention, and utility infrastructure that keeps airfields draining and running.

Explore utilities →

How we work

From active airfield to FAA-spec final grade.

One team plans and phases the work so runways, taxiways, and aprons reach spec without stopping operations.

01

Planning & Phasing: we sequence the work around flight schedules and airside access so operations keep moving.

02

Earthwork & Drainage: subgrade, safety areas, and drainage are graded to FAA tolerances ahead of paving.

03

Base & Paving: runway, taxiway, and apron sections are placed to spec grade and smoothness.

04

Testing & Turnover: grades and smoothness are verified, then each section is returned to active service.

Problems we solve

The challenges aviation sitework brings

01

Phasing around active operations

We sequence work around flight schedules and airside access so runways and taxiways stay in service while we build.

02

FAA-spec grades and smoothness

Machine control and constant survey hold cross-slope, profile, and smoothness to the tolerances FAA specs require.

03

Unsuitable ground at scale

From swamp stabilization to mass undercut, we engineer weak ground into airfield-grade subgrade, proven at Louis Armstrong and Lambert.

04

Security and airside access

Badged crews, escorts, and controlled access keep the operation secure and compliant inside the fence line.

Precise grades and safe airfields keep aircraft moving. We deliver them.

Safety

Safety is a culture, not a number.

For us, safety is more than an EMR figure. It’s how every crew shows up, every day. From daily planning and hazard analysis to ongoing crew training, we build safety into the work so our people go home safe and your project stays on track.

Daily hazard analysis

Every crew plans the work and the risks before it starts.

Ongoing safety training

Continuous training keeps our people sharp and certified.

Documented compliance

Full reporting and inspection coordination on every job.

Selected work

Airfields we've delivered

Aviation

Louis Armstrong Airport, New Orleans

Cypress swamp stabilized for expansion: 1,760,000 cy of sand imported and 14,000,000 lf of wick drain installed.

View project →
Aviation

Lambert Airport Grading & Paving 5/6

7,500,000 cy of excavation with finish grading held to a tenth of a foot across hundreds of acres.

View project →
Aviation

Airport Cast in Place Structures

86 aircraft-loaded cast-in-place structures and 28,000 lf of storm sewer, built inside the Airfield Operations Area.

View project →

Ready to break ground?

Let's talk about your airfield.

Send us the plans. We’ll build the takeoff and tell you straight what the site needs.