Kolb Grading performed clearing and major excavation at the Team Track Facility in Washington, Missouri, near the Missouri River. The scope included 140,000 cubic yards of excavation, 83,000 cubic yards of Class C excavation, 10 acres of heavy clearing and grubbing, lime stabilization, 50,000 cubic yards of pond muck-out, ditch liner placement, subblasting, and a mainline access road with fencing.
Scope of Work
- 140,000 cy excavation
- 10 ac heavy clearing and grubbing
- Lime stabilization
- 50,000 cy muck out ponds
- Furnish, haul, place and compact 6,000 tons ditch liner
- 83,000 cy Class C rock excavation
- Mainline access road and fencing
- 4,000 cy subblast
- Seeding and erosion control