At Sycamore Valley, Kolb Grading expanded a 4-acre lake into a 90-acre lake, removing the old dam and installing a new one. Along the existing hillside, crews cut and blasted roughly 2.5 miles of roadway around the lake while carefully preserving surrounding trees and vegetation, also installing a 48-foot arched pre-cast concrete bridge/spillway, grading for three houses, a pavilion and a boat ramp, and stabilizing the existing rock face with dental work and shotcrete.
Scope of Work
- Installed 48’ arched pre-cast concrete bridge/spillway
- Blasted for boathouse and channel leading into lake
- Graded for 3 houses, pavilion and boat ramp
- Performed extensive dental work on existing rock face
- Added shotcrete for stabilization
- Spillway construction