St. Louis Mills Mall

Hazelwood, Missouri

Project Overview

Kolb Grading was awarded two contracts at the St. Louis Mills Mall site. First, Kolb cleared and demolished the site before the Mills Partnership purchased 835+ acres for the mall; the partnership then engaged Kolb for excavation and utility installation. The work included moving 2,500,000 cubic yards of dirt, sanitary, storm, and water installation, dewatering, temporary haul roads, and soil stabilization with fly ash.

Scope of Work

  • Demolition; clearing and burning
  • Erosion control; 2,500,000 cy of dirt moved
  • Sanitary and storm installation
  • Water installation; dewatering; temporary haul roads
  • Soil stabilization with fly ash
  • Survey and engineering
  • Seeding and sodding
View all projects →

Project Details

Location

Hazelwood, Missouri

Contract Value

$11 Million