Aerial view of lime-stabilized access roads for the Split Rail Solar Farm in Warrenton, Missouri

Our Projects

Split Rail Solar Farm

Warrenton, Missouri

Project Overview

Kiewit selected Kolb Grading as a subcontractor for site work on the 300 MW Split Rail solar project in Warren County, Missouri, for Invenergy. The site covers 4,400 acres, so access roads, drainage, and erosion control all had to work at a very large scale.

Kolb built and lime-stabilized more than 165,000 square yards of access roads, prepared 108,563 square yards of parking and laydown, and removed and replaced 173,796 cubic yards of topsoil. Crews also installed nearly 26,000 feet of silt fence and 96,000 feet of smart fence, 17 sediment basins, and 172 riprap check dams.

Scope of Work

  • 4,400-acre site
  • 8 acres of fence row clearing
  • 108,563 sy parking and laydown
  • 173,796 cy topsoil removal and replacement
  • Traffic control
  • 25,980 lf of silt fence installation
  • 95,935 lf of smart fence installation
  • 165,070 sy of access roads built and lime stabilized
  • 17 sediment basins
  • 172 riprap check dams
View all projects →

Project Details

Location

Warrenton, Missouri

Client

Kiewit / Invenergy

Kolb's Role

Subcontractor

Contract Value

Undisclosed