Kolb Grading joined a partnership forming Page Constructors, which in 2013 was awarded Phase 3 of the Missouri Route 364 Page Avenue Extension. The design-build scope included unclassified excavation, more than 11 miles of new four-lane roadway, structures and box culverts, a new interchange at Route K, and connections to the existing road, all sequenced to minimize construction impact.
Scope of Work
- Unclassified excavation 3.5 Million CY
- Over 11 miles of new four-lane roadway
- Structures and box culverts
- Design-build to minimize impact of construction
- Connect new road to existing
- Design-build new interchange at Route K

