Linville Dam Embankment Improvement

Our Projects

Linville Dam Embankment Improvement

Morganton, North Carolina

Project Overview

Kolb Grading partnered with Alberici on the Linville Dam embankment improvement for Duke Energy in Morganton, North Carolina. The work included 375,000 cubic yards of borrow excavation, rock excavation, rock-lined ditches and stability berms, slope drains with a cast-in-place structure, over 7,000 tons of filter material, and rock check dams, with erosion control, access-road maintenance, and daily reporting.

Scope of Work

  • Erosion control and SWPPP
  • Access road maintenance
  • Rock-lined ditches and stability berms
  • Slope drains with cast-in-place structure
  • 375,000 cy borrow excavation
  • Over 7,000 tons of filter material
  • Rock check dams
  • Rock excavation
  • Daily reporting
View all projects →

Project Details

Location

Morganton, North Carolina

Contract Value

Undisclosed
Download Project Sheet

Have a site like this one?

Let's talk about your project.

Send us the plans. We’ll build the takeoff and tell you straight what the site needs.