Project Overview

Across the 800-acre Lakeside (Park) 370 recreational and business park in St. Peters, Missouri, Kolb Grading was awarded several excavation and utility contracts, working with Swallowtail on the environmental plan. Kolb moved 6 million cubic yards of dirt to create a 140-acre lake in 12 months, placed 3 million cubic yards of fill for a 4-mile levee, graded building sites to tight tolerances, repaved 9,000 square yards of concrete road, built a reverse filter system with over 100,000 tons of shot rock and liner, and installed 100,000 feet of storm, sanitary, and water main.

Scope of Work

  • 6 million cy excavation; 140-acre recreational lake
  • Placed 3 million cy of fill to create a 4-mile levee
  • Constructed building sites with finish grade to +/- 0.2
  • Access roads constructed using 11,000 tons of crushed aggregate
  • Demolished existing road, raised it, and repaved 9,000 sy of concrete
  • Placed over 100,000 tons of shot rock and liner in canals, creating a reverse filter system
  • 100,000 ft of storm, sanitary and water main
View all projects →

Project Details

Location

St. Peters, Missouri

Contract Value

$38 Million