Indiana US Interstate 69

Greene Co, Indiana

Project Overview

Kolb Grading worked on three contracts as part of Phase 5 of the I-69 construction in Indiana. The scope included 10,360,000 cubic yards of unclassified excavation plus Class C excavation, wick drains, over 10,000 feet of storm sewer, box installation up to 12’ x 6’, 530,000 square yards of geotextile, more than 500,000 tons of base rock, and over 145,000 tons of soil stabilization.

Scope of Work

  • 10,360,000 cy unclassified excavation
  • Class C excavation
  • Installation of wick drains
  • Over 10,000 ft of storm sewer installed
  • Box installation ranging from 36” to 12’ x 6’
  • 400 ac clearing and grubbing
  • 530,000 sy of geotextile
  • Over 500,000 tons of base rock installation
  • Over 145,000 tons soil stabilization