DCM Land selected Kolb Grading as a subcontractor to build out Cottleville Trails, a 300-acre master-planned development in Cottleville, Missouri. The plan includes 550 single-family homes, an entertainment venue, a storage facility, an apartment complex, a senior living facility, and two commercial outlots.
Kolb moved 3.3 million cubic yards of cut and fill to shape the site, built seven lakes with 21,576 feet of stabilized shoreline, and constructed two access bridges and five miles of trails. The scope also included a public parking lot and six sport courts.
Scope of Work
- 300-acre site
- 3.3 million cy of cut and fill
- 7 lakes
- 2 access bridges
- 5 miles of trails
- Public parking lot
- 6 sport courts
- 21,576 ft of shoreline stabilization

